Management
NAI Emory Hill Real Estate Group
7250 Parkway Drive, Hanover, MD
Project
FADRS® Controls Only (pronounced faders)
Smart Grid Technology Showcase utilizing patented Artificial Intelligence, Prediction & Human Centric Technology.
Contractors
Consolidated Energy Design (Patent Holders)
Third Party BAS Contractor (Fab & Installation)
Funding Agency
Maryland Energy Administration (MEA)
Grant 2015-05-517S5
“Novel Demand Response & Advanced Energy Management System”
Pre-Conditions
- 5 Story Tenant Occupied Office Building; 81,000 square feet
- 85 Water Source Heat Pump System
- Typical Building Automation System (BAS) for space heating/cooling.
Post Conditions
CONTROLS ONLY – Energy Conservation Measures (ECMs) – No New HVAC Equipment
- FADRS Painless Demand Response®
- FADRS Enhanced Building Automation System
- ~100 Power Quality Sub Meters (Deep granularity) + KYZ Pulse meter
ALL the ECMs were overlaid on top of the existing BAS and others were installed over a new BAS.
FULLY AUTOMATED control (No Human Intervention). Bidirectional control in real time.
Completion Date
FADRS Enhanced Building Automation System Performance:
HVAC Energy Savings from April 1, 2018, through March 31, 2019
Year Three Normalized Baseline (NBL) for HVAC = 1,627,934 KWh ($177,119)
Year Three HVAC Normalized Energy Savings = 454,715 KWh ($ 49,473) 27.9%
Year Three Carbon Reduction (CO2e EPA Calculations) = 318 Metric Tons
FADRS® Painless Demand Response® Performance:
(8/2/18 Summer Capacity Test)
172 KW down to 118 KW = 31% DR Reduction
IPKeys is the Curtailment Service Provider for this project and their PJM formula Calculations are found on the downloadable PDF button below.